Small Mining Plant

A project-led path from crushing and grinding through gravity recovery and concentration.

Process path

Crushing→Grinding→Gravity Recovery→Concentration

This is a discussion framework. The final equipment combination depends on the material and project inputs.

Equipment combination factors

OreConfirm this project input before defining equipment or configuration.
Feed SizeConfirm this project input before defining equipment or configuration.
CapacityConfirm this project input before defining equipment or configuration.
Target SizeConfirm this project input before defining equipment or configuration.
PowerConfirm this project input before defining equipment or configuration.
Recovery GoalConfirm this project input before defining equipment or configuration.

Explore the stages

Gold Processing

Gravity Recovery

Explore recovery and concentration context.

Learn more →

Real equipment references

Plan the interfaces between stages

A small plant needs a balanced route from feed preparation to recovery. These equipment references support the layout discussion; site access, power, water and maintenance space still need to be confirmed.

Jaw crusher feed opening and flywheels
Confirm the maximum feed size at the crushing stage. Equipment details →
Ball mill drum, access cover and ring gear
Match grinding feed and target size to the recovery route. Equipment details →
Jig hoppers, springs and drive assemblies
Review gravity equipment against the prepared material. Equipment details →

Inquiry support

Tell us about your project

Send material, feed size, required capacity, target size and power supply to begin a focused equipment conversation.