
Primary crushing
Review the material, feed size and reduction required before screening.
Explore jaw crushersConnect primary crushing, screening, conveying and return material around your required product.
5–10 TPH is a discussion target. Achievable throughput and the final configuration depend on material, feed size, output fractions and site conditions. This is not a fixed package or a delivered-project case study.
Conceptual route for discussion. Final configuration depends on project requirements.
Oversize return
Further crushingBack to screening
5–10 TPH is a discussion target, not guaranteed output. This is a planning concept, not a delivered-project case study.
Equipment views show individual components. Final configuration and throughput are confirmed against project requirements.

Review the material, feed size and reduction required before screening.
Explore jaw crushers
Discuss the required product sizes and the handling of oversize material.
Explore vibrating screensShare these inputs to begin a site-specific crushing and screening discussion.
View the project checklistInclude material type, hardness information, moisture and largest feed dimension.
List each required product size and its intended use.
Confirm the target throughput and planned operating hours.
Describe the separations required and any known screen-media preference.
Share available space, discharge locations, elevation changes and power.
Clarify which oversize fraction needs further crushing and how it returns to screening.
No standard equipment list can confirm this target without project inputs. Send available material information, size requirements and a simple site sketch with your inquiry.
Share feed size, target product and required throughput to begin.
sales@higongyi.com